Society

In Mykolaiv, the entrance to the garages of "Mykolaivpastrans" was leveled

The access road has been brought into proper condition for buses

Цей матеріал також доступний:

In Mykolaiv, levelling with asphalt chippings was completed at the entrance to the bus depot of KP “Mykolaivpastrans”.

The works were carried out by specialists of KP “ELU Avtodorih”. Previously this section had significant potholes and surface undulations, which complicated bus movement and made it more dangerous.

Heavy goods vehicles, which used this section as a detour, added extra load.

After completion of the works, the roadway was leveled and brought to proper condition. Now vehicles can enter the garage area more safely.

Source: Mykolaiv City Council.

Читайте новини першими

Связанные статьи

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button