{"id":622429,"date":"2026-10-05T15:35:21","date_gmt":"2026-10-05T12:35:21","guid":{"rendered":"https:\/\/korabelov.info\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/"},"modified":"2026-10-05T15:35:24","modified_gmt":"2026-10-05T12:35:24","slug":"boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter","status":"publish","type":"post","link":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/","title":{"rendered":"Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter"},"content":{"rendered":"<p>In <strong>Mykolaiv<\/strong>, preparations of heat-supply enterprises for the winter are being completed to ensure stable heating in residents&#8217; homes. The completed works and the current readiness of <strong>OKP \u00abMykolaivoblteploenergo\u00bb<\/strong> and <strong>Mykolaiv CHP<\/strong> were reported on <strong>October 5<\/strong> at the staff meeting.<\/p>\n<blockquote class=\"quote-light\"><p><strong>\u00abMykolaivoblteploenergo\u00bb<\/strong> has already prepared all of its own infrastructure for operation. The executed works include:<\/p><\/blockquote>\n<ul>\n<li>preparation of <strong>95 boiler houses<\/strong>;<\/li>\n<li>preparation of <strong>24 central heating substations<\/strong>;<\/li>\n<li>preparation of <strong>130 individual heating units<\/strong>;<\/li>\n<li>routine repair of <strong>351 boilers<\/strong>;<\/li>\n<li>overhaul of <strong>19 additional boilers<\/strong>;<\/li>\n<li>installation of <strong>17 new pumps<\/strong>.<\/li>\n<\/ul>\n<p>A separate direction of the company&#8217;s preparations is strengthening energy independence. This year its equipment fleet was supplemented by <strong>6 more generators<\/strong>. This became possible, in particular, with the support of international partners and donors.<\/p>\n<p>Also, <strong>\u00abMykolaivoblteploenergo\u00bb<\/strong> renewed about <strong>3 kilometers of heating networks<\/strong>. For these works, <strong>97 sections<\/strong> in the city were excavated. On <strong>33 of them<\/strong> the works are already completed and the areas fully restored.<\/p>\n<p>At the <strong>Mykolaiv CHP<\/strong>, the boiler equipment is fully prepared for the heating season. The company&#8217;s own crews replaced about <strong>3 kilometers of networks<\/strong>.<\/p>\n<p>At the same time, repairs on certain sections of the CHP&#8217;s heat pipelines are still ongoing. They are expected to be fully completed by <strong>October 15<\/strong>. The overall readiness of the <strong>Mykolaiv CHP<\/strong> is currently almost <strong>88%<\/strong>.<\/p>\n<p><em>Source: <a href=\"https:\/\/t.me\/mykolaivrada\/27107\" target=\"_blank\" rel=\"noopener\">Mykolaiv City Council<\/a>.<\/em><\/p>\n<p><!-- telegram-source:mykolaivrada:27107 --><\/p>\n<p><strong>Previously we wrote:<\/strong><\/p>\n<ul>\n<li><a href=\"https:\/\/korabelov.info\/en\/2026\/09\/617525\/korabeliv-street-in-mykolaiv-will-be-completely-closed-due-to-heating-network-repairs\/\" target=\"_blank\" rel=\"noopener\">Korabeliv Street in Mykolaiv will be completely closed due to heating network repairs<\/a><\/li>\n<li><a href=\"https:\/\/korabelov.info\/en\/2026\/08\/607426\/in-mykolaiv-a-boiler-house-is-being-modernized-to-ensure-stable-heat-supply\/\" target=\"_blank\" rel=\"noopener\">In Mykolaiv, a boiler house is being modernized to ensure stable heat supply<\/a><\/li>\n<li><a href=\"https:\/\/korabelov.info\/en\/2026\/07\/597970\/to-prevent-apartments-from-freezing-again-this-winter-backup-power-is-once-again-promised-in-the-korabelnyi-district\/\" target=\"_blank\" rel=\"noopener\">So that apartments don&#8217;t freeze again in winter: reserve power supply to be reinstated in the Korabelnyi district<\/a><\/li>\n<li><a href=\"https:\/\/korabelov.info\/en\/2026\/05\/586641\/adventists-help-insulate-the-heating-main-in-the-korabelnyi-district\/\" target=\"_blank\" rel=\"noopener\">Adventists help insulate the heat pipeline in the Korabelnyi district<\/a><\/li>\n<li><a href=\"https:\/\/korabelov.info\/en\/2026\/03\/578830\/residents-and-hoas-to-blame-why-some-buildings-were-left-without-heat-during-the-winter\/\" target=\"_blank\" rel=\"noopener\">Residents and condominium associations (OSBB) to blame: why some buildings were left without heat in winter<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>\ud83d\udd27 The municipal utility prepared 95 boiler houses and installed 17 new pumps. For energy independence, they added six more generators.<\/p>\n<p>\ud83d\udd39 \u2668\ufe0f Both companies renovated roughly three kilometers each of heating networks. Repairs of certain sections at the CHP are planned to be completed by October 15.<\/p>\n","protected":false},"author":12394,"featured_media":622403,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","tstyn_error":"","tie_post_sub_title":"Mykolaiv CHP is almost 88% ready for the heating season"},"categories":[3680,3607],"tags":[4135,4492,4280],"class_list":["post-622429","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-suspilstvo","category-tema-dnya-uk","tag-opalennya","tag-nikolaevshhina","tag-mikolaivoblteploenergo"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter - \u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u041d\u0438\u043a\u043e\u043b\u0430\u0435\u0432\u0430 c\u0435\u0433\u043e\u0434\u043d\u044f<\/title>\n<meta name=\"description\" content=\"\ud83d\udd27 The municipal utility prepared 95 boiler houses and installed 17 new pumps. For energy independence, they added six more generators. \ud83d\udd39 \u2668\ufe0f Both companies renovated roughly three kilometers each of heating networks. Repairs of certain sections at the CHP are planned to be completed by October 15. | \u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter\" \/>\n<meta property=\"og:description\" content=\"\ud83d\udd27 The municipal utility prepared 95 boiler houses and installed 17 new pumps. For energy independence, they added six more generators. \ud83d\udd39 \u2668\ufe0f Both companies renovated roughly three kilometers each of heating networks. Repairs of certain sections at the CHP are planned to be completed by October 15. | \u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e\" \/>\n<meta property=\"og:url\" content=\"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/\" \/>\n<meta property=\"og:site_name\" content=\"\u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u041d\u0438\u043a\u043e\u043b\u0430\u0435\u0432\u0430 c\u0435\u0433\u043e\u0434\u043d\u044f\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/korabelovinfo\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-05T12:35:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-05T12:35:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/korabelov.info\/wp-content\/uploads\/2026\/10\/news-d20fee802cfdda002392804c-cb050a6251de5893.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"419\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Modern\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Modern\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/\"},\"author\":{\"name\":\"Modern\",\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/#\\\/schema\\\/person\\\/a56bea94f434cf219bea48ae0ad2db79\"},\"headline\":\"Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter\",\"datePublished\":\"2026-10-05T12:35:21+00:00\",\"dateModified\":\"2026-10-05T12:35:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/\"},\"wordCount\":299,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/korabelov.info\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/news-d20fee802cfdda002392804c-cb050a6251de5893.jpg\",\"keywords\":[\"\u043e\u043f\u0430\u043b\u0435\u043d\u043d\u044f\",\"\u041c\u0438\u043a\u043e\u043b\u0430\u0457\u0432\u0449\u0438\u043d\u0430\",\"\u041c\u0438\u043a\u043e\u043b\u0430\u0457\u0432\u043e\u0431\u043b\u0442\u0435\u043f\u043b\u043e\u0435\u043d\u0435\u0440\u0433\u043e\"],\"articleSection\":[\"\u0421\u0443\u0441\u043f\u0456\u043b\u044c\u0441\u0442\u0432\u043e\",\"\u0422\u0435\u043c\u0430 \u0434\u043d\u044f\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/#respond\"]}],\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/\",\"url\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/\",\"name\":\"Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter - \u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u041d\u0438\u043a\u043e\u043b\u0430\u0435\u0432\u0430 c\u0435\u0433\u043e\u0434\u043d\u044f\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/korabelov.info\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/news-d20fee802cfdda002392804c-cb050a6251de5893.jpg\",\"datePublished\":\"2026-10-05T12:35:21+00:00\",\"dateModified\":\"2026-10-05T12:35:24+00:00\",\"description\":\"\ud83d\udd27 The municipal utility prepared 95 boiler houses and installed 17 new pumps. For energy independence, they added six more generators. \ud83d\udd39 \u2668\ufe0f Both companies renovated roughly three kilometers each of heating networks. Repairs of certain sections at the CHP are planned to be completed by October 15. | \u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/#primaryimage\",\"url\":\"https:\\\/\\\/korabelov.info\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/news-d20fee802cfdda002392804c-cb050a6251de5893.jpg\",\"contentUrl\":\"https:\\\/\\\/korabelov.info\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/news-d20fee802cfdda002392804c-cb050a6251de5893.jpg\",\"width\":800,\"height\":419,\"caption\":\"\u041f\u0456\u0434\u0433\u043e\u0442\u043e\u0432\u043a\u0430 \u0442\u0435\u043f\u043b\u043e\u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u0456\u0434\u043f\u0440\u0438\u0454\u043c\u0441\u0442\u0432 \u041c\u0438\u043a\u043e\u043b\u0430\u0454\u0432\u0430 \u0434\u043e \u043e\u043f\u0430\u043b\u044e\u0432\u0430\u043b\u044c\u043d\u043e\u0433\u043e \u0441\u0435\u0437\u043e\u043d\u0443\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/2026\\\/10\\\/622429\\\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"korabelov.info\",\"item\":\"https:\\\/\\\/korabelov.info\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Society\",\"item\":\"https:\\\/\\\/korabelov.info\\\/en\\\/society\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/korabelov.info\\\/en\\\/\",\"name\":\"\u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u041d\u0438\u043a\u043e\u043b\u0430\u0435\u0432\u0430 c\u0435\u0433\u043e\u0434\u043d\u044f\",\"description\":\"\u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u041a\u043e\u0440\u0430\u0431\u0435\u043b\u044c\u043d\u043e\u0433\u043e \u0440\u0430\u0439\u043e\u043d\u0430 \u0433\u043e\u0440\u043e\u0434\u0430 \u041d\u0438\u043a\u043e\u043b\u0430\u0435\u0432\u0430\",\"publisher\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/#organization\"},\"alternateName\":\"\u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/korabelov.info\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/#organization\",\"name\":\"\u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e\",\"url\":\"https:\\\/\\\/korabelov.info\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/korabelov.info\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/izobrazhenie_viber_2020-11-21_17-05-33.jpg\",\"contentUrl\":\"https:\\\/\\\/korabelov.info\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/izobrazhenie_viber_2020-11-21_17-05-33.jpg\",\"width\":1001,\"height\":1001,\"caption\":\"\u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e\"},\"image\":{\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/korabelovinfo\\\/\",\"https:\\\/\\\/www.instagram.com\\\/korabelov.info\\\/\",\"https:\\\/\\\/www.pinterest.com\\\/korabelov_info\\\/\"],\"publishingPrinciples\":\"https:\\\/\\\/korabelov.info\\\/privacy-policy\\\/\",\"ownershipFundingInfo\":\"https:\\\/\\\/korabelov.info\\\/pro-nas-kontaktna-informatsiia\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/korabelov.info\\\/en\\\/#\\\/schema\\\/person\\\/a56bea94f434cf219bea48ae0ad2db79\",\"name\":\"Modern\",\"url\":\"https:\\\/\\\/korabelov.info\\\/en\\\/author\\\/modern\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter - \u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u041d\u0438\u043a\u043e\u043b\u0430\u0435\u0432\u0430 c\u0435\u0433\u043e\u0434\u043d\u044f","description":"\ud83d\udd27 The municipal utility prepared 95 boiler houses and installed 17 new pumps. For energy independence, they added six more generators. \ud83d\udd39 \u2668\ufe0f Both companies renovated roughly three kilometers each of heating networks. Repairs of certain sections at the CHP are planned to be completed by October 15. | \u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/","og_locale":"en_US","og_type":"article","og_title":"Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter","og_description":"\ud83d\udd27 The municipal utility prepared 95 boiler houses and installed 17 new pumps. For energy independence, they added six more generators. \ud83d\udd39 \u2668\ufe0f Both companies renovated roughly three kilometers each of heating networks. Repairs of certain sections at the CHP are planned to be completed by October 15. | \u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e","og_url":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/","og_site_name":"\u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u041d\u0438\u043a\u043e\u043b\u0430\u0435\u0432\u0430 c\u0435\u0433\u043e\u0434\u043d\u044f","article_publisher":"https:\/\/www.facebook.com\/korabelovinfo\/","article_published_time":"2026-10-05T12:35:21+00:00","article_modified_time":"2026-10-05T12:35:24+00:00","og_image":[{"width":800,"height":419,"url":"https:\/\/korabelov.info\/wp-content\/uploads\/2026\/10\/news-d20fee802cfdda002392804c-cb050a6251de5893.jpg","type":"image\/jpeg"}],"author":"Modern","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Modern","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/#article","isPartOf":{"@id":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/"},"author":{"name":"Modern","@id":"https:\/\/korabelov.info\/en\/#\/schema\/person\/a56bea94f434cf219bea48ae0ad2db79"},"headline":"Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter","datePublished":"2026-10-05T12:35:21+00:00","dateModified":"2026-10-05T12:35:24+00:00","mainEntityOfPage":{"@id":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/"},"wordCount":299,"commentCount":0,"publisher":{"@id":"https:\/\/korabelov.info\/en\/#organization"},"image":{"@id":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/#primaryimage"},"thumbnailUrl":"https:\/\/korabelov.info\/wp-content\/uploads\/2026\/10\/news-d20fee802cfdda002392804c-cb050a6251de5893.jpg","keywords":["\u043e\u043f\u0430\u043b\u0435\u043d\u043d\u044f","\u041c\u0438\u043a\u043e\u043b\u0430\u0457\u0432\u0449\u0438\u043d\u0430","\u041c\u0438\u043a\u043e\u043b\u0430\u0457\u0432\u043e\u0431\u043b\u0442\u0435\u043f\u043b\u043e\u0435\u043d\u0435\u0440\u0433\u043e"],"articleSection":["\u0421\u0443\u0441\u043f\u0456\u043b\u044c\u0441\u0442\u0432\u043e","\u0422\u0435\u043c\u0430 \u0434\u043d\u044f"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/#respond"]}],"copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/korabelov.info\/#organization"}},{"@type":"WebPage","@id":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/","url":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/","name":"Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter - \u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u041d\u0438\u043a\u043e\u043b\u0430\u0435\u0432\u0430 c\u0435\u0433\u043e\u0434\u043d\u044f","isPartOf":{"@id":"https:\/\/korabelov.info\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/#primaryimage"},"image":{"@id":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/#primaryimage"},"thumbnailUrl":"https:\/\/korabelov.info\/wp-content\/uploads\/2026\/10\/news-d20fee802cfdda002392804c-cb050a6251de5893.jpg","datePublished":"2026-10-05T12:35:21+00:00","dateModified":"2026-10-05T12:35:24+00:00","description":"\ud83d\udd27 The municipal utility prepared 95 boiler houses and installed 17 new pumps. For energy independence, they added six more generators. \ud83d\udd39 \u2668\ufe0f Both companies renovated roughly three kilometers each of heating networks. Repairs of certain sections at the CHP are planned to be completed by October 15. | \u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e","breadcrumb":{"@id":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/#primaryimage","url":"https:\/\/korabelov.info\/wp-content\/uploads\/2026\/10\/news-d20fee802cfdda002392804c-cb050a6251de5893.jpg","contentUrl":"https:\/\/korabelov.info\/wp-content\/uploads\/2026\/10\/news-d20fee802cfdda002392804c-cb050a6251de5893.jpg","width":800,"height":419,"caption":"\u041f\u0456\u0434\u0433\u043e\u0442\u043e\u0432\u043a\u0430 \u0442\u0435\u043f\u043b\u043e\u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u0456\u0434\u043f\u0440\u0438\u0454\u043c\u0441\u0442\u0432 \u041c\u0438\u043a\u043e\u043b\u0430\u0454\u0432\u0430 \u0434\u043e \u043e\u043f\u0430\u043b\u044e\u0432\u0430\u043b\u044c\u043d\u043e\u0433\u043e \u0441\u0435\u0437\u043e\u043d\u0443"},{"@type":"BreadcrumbList","@id":"https:\/\/korabelov.info\/en\/2026\/10\/622429\/boiler-plants-are-ready-networks-are-still-being-repaired-how-mykolaiv-is-preparing-for-winter\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"korabelov.info","item":"https:\/\/korabelov.info\/en\/"},{"@type":"ListItem","position":2,"name":"Society","item":"https:\/\/korabelov.info\/en\/society\/"},{"@type":"ListItem","position":3,"name":"Boiler plants are ready, networks are still being repaired: how Mykolaiv is preparing for winter"}]},{"@type":"WebSite","@id":"https:\/\/korabelov.info\/en\/#website","url":"https:\/\/korabelov.info\/en\/","name":"\u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u041d\u0438\u043a\u043e\u043b\u0430\u0435\u0432\u0430 c\u0435\u0433\u043e\u0434\u043d\u044f","description":"\u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u041a\u043e\u0440\u0430\u0431\u0435\u043b\u044c\u043d\u043e\u0433\u043e \u0440\u0430\u0439\u043e\u043d\u0430 \u0433\u043e\u0440\u043e\u0434\u0430 \u041d\u0438\u043a\u043e\u043b\u0430\u0435\u0432\u0430","publisher":{"@id":"https:\/\/korabelov.info\/en\/#organization"},"alternateName":"\u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/korabelov.info\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/korabelov.info\/en\/#organization","name":"\u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e","url":"https:\/\/korabelov.info\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/korabelov.info\/en\/#\/schema\/logo\/image\/","url":"https:\/\/korabelov.info\/wp-content\/uploads\/2021\/09\/izobrazhenie_viber_2020-11-21_17-05-33.jpg","contentUrl":"https:\/\/korabelov.info\/wp-content\/uploads\/2021\/09\/izobrazhenie_viber_2020-11-21_17-05-33.jpg","width":1001,"height":1001,"caption":"\u041a\u043e\u0440\u0430\u0431\u0435\u043b\u043e\u0432.\u0418\u041d\u0424\u041e"},"image":{"@id":"https:\/\/korabelov.info\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/korabelovinfo\/","https:\/\/www.instagram.com\/korabelov.info\/","https:\/\/www.pinterest.com\/korabelov_info\/"],"publishingPrinciples":"https:\/\/korabelov.info\/privacy-policy\/","ownershipFundingInfo":"https:\/\/korabelov.info\/pro-nas-kontaktna-informatsiia\/"},{"@type":"Person","@id":"https:\/\/korabelov.info\/en\/#\/schema\/person\/a56bea94f434cf219bea48ae0ad2db79","name":"Modern","url":"https:\/\/korabelov.info\/en\/author\/modern\/"}]}},"wpml_current_locale":"en_US","wpml_translations":[],"_links":{"self":[{"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/posts\/622429","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/users\/12394"}],"replies":[{"embeddable":true,"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/comments?post=622429"}],"version-history":[{"count":1,"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/posts\/622429\/revisions"}],"predecessor-version":[{"id":622431,"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/posts\/622429\/revisions\/622431"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/media\/622403"}],"wp:attachment":[{"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/media?parent=622429"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/categories?post=622429"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/korabelov.info\/en\/wp-json\/wp\/v2\/tags?post=622429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}